ACEY-BA100200-6 battery pack charge discharge test equipment is mainly used to test cycle life, capacity, charge/discharge characteristics, temperature characteristics for ternary, lithium iron phosphate, lead-acid, nickel-metal hydride nickel-cadmium and other battery pack.
Brand:
ACEYItem No.:
ACEY-BA100200-6Compliance:
CE CertifiedWarranty:
One Year warranty with lifetime supportOrder(Moq):
1 SetPayment:
T/TProduct Origin:
ChinaLead Time:
7days100V 200A Charge 200A Discharge Energy-Feedback Battery Pack Charge Discharge Tester
Equipment Composition
The battery pack test system mainly includes power supply module, AC/DC voltage conversion module (bi-directional AC/DC inverter), control module, power module, heat dissipation system, data acquisition system (single cell, total voltage, current, temperature), upper computer data processing system, and cabinet structure.
Application
1. Applicable to the same port battery pack and sub-port battery pack.
2. Equipment aging battery pack voltage range 10V ~ 100V, charging and discharging current range 100mA~200A adjustable
3. Battery manufacturing enterprises battery module production testing.
4. EV/HEV power battery system high current charging and discharging detection.
5. High-current charging and discharging testing of battery modules, battery performance testing, etc
6. Daily battery module maintenance in battery factories and charging stations
Advantages
1. Voltage and current accuracy ± (0.1%RD+0.1%FS), data recording time 5S/time, high stability.
2. The whole cabinet can hold 6 channels. Can be set for independent charging and discharging conditions after free grouping for each channel.
3. complete input and output, software and hardware protection, reverse connection protection, power failure renewal, short circuit protection, etc.
4. Channel start without inrush current, constant current to constant voltage seamlessly over, without any current surges
5. Network integrated management, a computer centralized control, support remote monitoring
6. Modular design of power unit, easy to produce, easy to maintain
7. Clear and comprehensive data, real-time monitoring and uploading to MES system
Parameters
NO |
Item |
Function requirement |
||
1 |
Channel |
6 |
||
2 |
Action Mode |
Completely independent |
||
3 |
Main channel work mode |
Charging: constant current and constant voltage charging CCCV.&CC Discharge: constant current discharge CD.& CP Resting, stopping |
||
Main channel test abort condition |
Time, voltage, current, capacity, etc |
|||
4 |
Voltage of main channel |
Votage range of Charge&discharge |
10V-100V |
|
Accuracy |
±(0.1%RD+0.1%FS) |
|||
Resolution |
1mV |
|||
Current of main channel |
Maximum output current |
200A |
||
Minimum output current |
100mA |
|||
Accuracy |
±(0.1%RD+0.1%FS) |
|||
Resolution |
1mA |
|||
Power |
Output |
Single channel continuous operation maximum power 20KW |
||
Auxiliary channel parameter cut-off function |
The main channel step can be set to stop or switch when the auxiliary channel signal reaches certain conditions. |
|||
5 |
Control program |
Support for power-down data protection, support for power outages, manual stopping and succession of tests from data files. |
||
Safety protection conditions can be set, including: lower voltage limit, upper voltage limit, lower current limit, upper current limit, voltage and current trend。 |
||||
Auxiliary channel protection conditions can be set and parameters can be set including: upper voltage limit, lower voltage limit, upper temperature limit and lower temperature limit. |
||||
Cycle times |
Max 9999 |
|||
Work step time unit |
h、min、s are available |
|||
Data logging |
Min 5S |
|||
6 |
Data display method |
Loop List |
cycle number, charge/discharge capacity, charge/discharge efficiency, charge/discharge energy, charge/discharge average voltage, etc. |
|
Process List |
process serial number, operation mode, process time, capacity, energy, median voltage, termination voltage, termination current, etc. |
|||
|
Detailed list |
There are record serial number, system time, accumulated time, voltage, current, energy, power, etc. |
||
7 |
Data export method |
The data can be exported to EXCEL and chart files, which can provide a variety of data analysis curves such as charging and discharging efficiency, charging and discharging curves, voltage, capacity, current time characteristics, etc., and the curves can be imported into EXCEL. |
||
8 |
Curve Type |
X coordinate: total time, charging and discharging capacity, cycle times, etc., can be set freely. |
||
Y coordinate: total voltage, current, capacity, single body temperature, charge/discharge capacity, single body voltage, etc., can be set freely. |
||||
9 |
Software protection |
Power-down data protection, power-off pause renewal, over-voltage and over-discharge protection, over-current and under-current protection, capacity protection, over-temperature protection, abnormal current fluctuation protection, abnormal charging voltage rise rate protection, abnormal discharge voltage fall rate protection. |
||
Hardware protection |
Battery reversal, over-current protection, over-voltage protection, short-circuit protection. |
|||
Alarm function |
The hardware has functions such as emergency cut-off switch, automatic shutdown after power failure, and automatic load connection and disconnection. |
|||
10 |
Output wire |
Four-wire connection mode with separate current and voltage lines. |
||
11 |
Maintainability |
Modular structure, available spare parts, spare parts for timely replacement, repair, free of charge during the warranty period. |
||
12 |
Test channel and battery pack connection method |
OT clamp |
||
13 |
Equipment testing environment and technical requirements |
Single cabinet requires 30KW 380V three-phase four-wire power configuration, ventilation and dry plant Working environment: temperature -10℃~40℃ / humidity: 10%~90% |
Product Display